YOU LIKE US BUT YOU NEED

Redesign the plan ?

With our team of designers, we will help you redesign any project exactly according to your ideas and local conditions. Don't be shy and

CLICK

LEVA

PAVO REDESIGN

8.387,00 Kč
Tax included.
PLAN VARIANTS: BRICK
OPTIONS: BUILD UP AREA
BUILD UP AREA

10 WEEKS DELIVERY

Changing the floor plan of the house project, changing the layout of the interior rooms by moving parts, minor changes to utility networks, minor changes to the location or size of windows and doors.

New production plans of a wooden structure or CLT without recalculation of the statics of the structure according to the customer's requirements (according to local construction conditions - snow loading).

It includes changes in the UTILITIES installations that must be made every time the structural elements of the building are changed.

________

FLOOR PLAN

8 WEEKS DELIVERY

Changing the floor plan of the house project, changing the layout of the interior rooms by moving parts, minor changes to utility networks, minor changes to the location or size of windows and doors.

New production plans of wooden construction or CLT without recalculation of structural statics according to customer requirements (according to local construction conditions - snow loading).

It includes changes in the UTILITIES installations that must be made every time the structural elements of the building are changed.

________

SNOW LOADING

8 WEEKS DELIVERY

Changing the plan of the house project according to the local conditions of snow load, the layout of the interior rooms, minor changes to utilities, the location or size of windows and doors are not changed.

New production plans of wooden structure or CLT without recalculation of structural statics.

It includes changes in the UTILITIES installations that must be made every time the structural elements of the building are changed.

________

HVAC

10 WEEKS DELIVERY

Changing the energy concept of the house project according to the local climatic conditions and the client's needs. Complete redesign of the HVAC (Heating, Ventilation, and Air Conditioning) system and related wiring, minor changes to other utility networks, no changes to the layout of interior rooms or the location or size of windows and doors.

New production plans of wooden structure or CLT without recalculation of structural statics.

PLAN VARIANTS
OPTIONS
Product information
A – BASIC (BRICK)

This is the classic building variant with solid brick walls, a ceiling that can come in multiple options depending on your preference, and a wooden roof structure. It represents a traditional and proven construction method offering good thermal mass and durability.

B1 – TIMBER FRAME (CONCRETE FOUNDATIONS)

This option uses timber frame technology as the main structural system combined with concrete foundations. Timber frames are known for their speed of construction, excellent insulation properties, and sustainability. It’s ideal for clients who prefer lightweight, environmentally friendly structures without compromising strength.

B2 – TIMBER FRAME (SCREW PILE FOUNDATIONS)

This variant uses timber frame technology with screw pile foundations (vruty). It offers all the advantages of timber frame construction while enabling fast, low-impact installation of the foundations, making it suitable for areas with challenging soil conditions or where minimal excavation is preferred.

C – CLT (CROSS - LAMINATED TIMBER)

The CLT variant features cross-laminated timber panels for walls, floors, and roofs. CLT provides high structural performance with great design flexibility and superior insulation. It’s an innovative, modern construction method popular in contemporary architecture.

FACADES

For the facade, two variants are always available:

  • Contact insulation system (ETICS)
  • Ventilated facade system

This allows you to tailor the building envelope to your local climate and aesthetic preferences.

TECHNOLOGY

Our projects include options for mechanical, electrical, plumbing, HVAC, and solar systems designed to perform optimally in different climate conditions:

  • H1 : technology designed for extreme cold climates down to -25°C
  • H2 : systems suitable for colder climates down to -10°C
  • H3 : technology adapted for milder climates down to +5°C

Choosing the right technology package ensures energy efficiency, comfort, and system longevity.

M – FURNITURE & EQUIPMENT

This variant covers interior furniture and equipment included in the project. It allows clients to plan and visualize not only the building structure but also the interior layout and furnishing, making the project more comprehensive and ready for implementation.

Visualizing Your Choice with GLB Models
To help you better understand each variant and what exactly is included in your chosen project, we provide interactive 3D GLB models. These models allow you to explore the structure, technologies, and furniture virtually from every angle, giving you complete confidence in your selection before proceeding.