Turn your real projects into premium digital products

Create, publish, and earn with us

Share your building expertise, add your execution insights, and transform any project into a high-value digital product. With LEVA’s variant x and Execution Budgeting, your knowledge becomes a new revenue stream — scalable, passive, and built to grow over time.

BUDGETING INFORMATIONS FILLED BY BUILDER in

x / execution variant

Your income breakdown made simple

Earning potential in  one clear calculation 

A transparent overview of how creators earn on LEVA. This model combines multiple income streams — YouTube views, your premium execution insights, base project revenue, and affiliate commissions when your audience purchases additional projects. One project can generate income from several parallel sources.

CALCULATION EXAMPLE

Estimate total : $57,000

YouTube

With 100,000 YouTube views, a typical long-form build video earns $1,000–$2,000, depending on audience geography, RPM, and overall watchtime. It also continuously sends new viewers to your LEVA project.

Base Variant

If your base project is priced at $120, your creator share is 30%, meaning 200 sales generate $7,200 in revenue. The standard version builds trust and drives users toward the premium upgrade.

X variant

Each premium purchase includes both the base project and the upgrade. With 85 Execution Budget items, you earn $36 + $68 = $104 per sale. At 400 sales, this gives you $41,600 in creator revenue.

Affiliate

Your affiliate link keeps earning in the background. If your audience buys other creators’ projects worth $65,000, you receive 10% — adding an additional $6,500 to your total revenue.

how to build The most effective creator funnel

Step by step  guideline 

A simple, structured process that turns your real build into a high-performing digital product. By following each step — selecting your project, adding execution insights, publishing a full build video, and promoting your link — you maximize reach, engagement, and overall results.

Step 1
CHOOSE YOUR PROJECT &

We prepare the digital version

Select one of your real builds and LEVA will turn it into a complete digital project — including BIM model, BOQ, 3D/AR previews, and documentation. Most projects can be created together with you for free, so you can start earning without any upfront cost.

STEP 2
CREATE START TO FINISH

Youtube video tutorial

Your full build video becomes the engine of the entire system. Because construction content has naturally high watchtime, YouTube rewards it with strong RPM and steady long-term visibility.

Learn more
Step 3
EXECUTION BUDGETING

Add your real-life know-how

Fill in installation times, workflows, difficulty, tools, and notes directly on the project page using a clean and simple UI. LEVA converts your expertise into a structured premium upgrade with high perceived value and strong conversion potential.

STEP 4
PROMOTE & GROW

Boost your project reach

Share your project link across your channels and let the LEVA ecosystem work for you. Users exploring projects from other creators can discover yours too, creating a multiplying effect that increases downloads, visibility, and premium conversions over time.

Step 5
PLAN YOUR NEXT MOVE

Enjoy money or multiply it

Whether you use your earnings to treat yourself or reinvest them into even bigger builds, the choice is yours. Many creators use their first project to fund new ideas — scaling their income by producing more digital projects with LEVA.

See what your project can become

A preview of   your digital product  

This sample shows how your real build transforms into a complete digital package on LEVA — including visualizations, 3D/AR views, quantity takeoffs, and execution insights. A clear, polished presentation that your audience can explore, download, and upgrade.

BY ERIK SOLBERG

Under the stars

0,00 Kč
BESTSELLER
TINY HOUSE
MEP INCLUDED
Tax included.
PLAN VARIANTS: B
🏡 Design & Structure
  • A-frame cabin with striking triangular silhouette and panoramic glass façade
  • Warm timber cladding contrasts with the snowy forest setting
  • Compact yet functional layout with extended side wing for additional space
🔥 Interior & Comfort
  • Open living area with large windows framing views of the winter landscape
  • Wood-burning stove creates a cozy retreat atmosphere
  • Minimalist furniture enhances the sense of calm and spaciousness
🌲 Nature Integration
  • Positioned directly by the waterfront, reflecting cabin lights at night
  • Surrounded by dense forest and snow, offering full seasonal immersion
  • Perfect for glamping, weekend escapes, or year-round nature living
Product information
A – BRICK (CLASSIC MASONRY)

Solid brick construction with high thermal mass, excellent acoustic performance, and long-term durability. This traditional system features load-bearing masonry walls, a selectable ceiling structure, and a timber roof. A timeless and proven method suitable for a wide range of environments.

B – TIMBER FRAME

Lightweight wood-frame system designed for precision, fast construction, and sustainability. Offers high insulation performance, reduced material consumption, and excellent suitability for modern energy-efficient homes.

C – CLT (CROSS-LAMINATED TIMBER)

Mass-timber system using CLT panels for walls, floors, and roof. Provides outstanding structural stability, architectural flexibility, and a warm natural interior finish. Ideal for contemporary and eco-conscious construction.

D – TIMBER FRAME (ALTERNATIVE FOUNDATIONS)

Lightweight timber-frame system designed for precision, fast installation, and sustainability. Built on simplified foundations — concrete footing pads or screw piles — allowing minimal excavation, lower environmental impact, and excellent adaptability to uneven or sensitive terrain.

E – CLT (ALTERNATIVE FOUNDATIONS)

CLT-based mass-timber system adapted for simplified foundation types such as concrete footing pads or screw piles. Combines the robustness and architectural quality of CLT with rapid installation, minimal site disturbance, and suitability for challenging or irregular terrain.

H – TECHNOLOGY PACKAGE

A set of mechanical, electrical, plumbing, HVAC, and solar components forming the project’s integrated technical infrastructure. The exact scope of included systems varies by project — always check the specific project description to verify which components are part of this variant. The specific climate parameters and temperature range for which the system is designed are also defined individually in each project description.

x – EXECUTION BUDGET (EXTENDED VARIANT)

A lowercase x added to any variant (e.g., Bx, Dx, Ex) indicates an extended execution budget — an expanded package created by the author who has built the project in real life from start to finish.

Each item includes:

  • Mandatory fields: Time Duration, Workers, Difficulty, Notes
  • Optional fields: Timeline, Video Tutorial, Additional Costs

The price of the x variant is increased by 1 USD for every item in the budget that contains at least the mandatory fields.
Example: If the budget contains 85 items and 60 items have all mandatory parameters filled in, the x variant is priced 60 USD higher.

FACADES

Each structural variant offers two façade options:

  • ETICS (contact insulation system)
  • Ventilated façade system
M – FURNITURE & INTERIOR PACKAGE

Optional upgrade including interior furniture, built-ins, and equipment to complete the full spatial layout and interior design.

3D INTERACTIVE MODELS (GLB)

All variants include interactive 3D GLB models. Explore structure, layers, technologies, and interiors from any angle — providing a clear and intuitive understanding before construction begins.

  • BILL OF QUANTITIES (on LEVA product page)
  • BLUEPRINTS (dwg, pdf)
  • 3D MODEL (IFC online, GLB online)
  • MANUFACTURING DATASHEETS according plan variants - timber frames or CLT pannels
  • CONSTRUCTION ASSEMBLIES
ARCHITECTURAL & CONSTRUCTION DESIGN

DOORS

  • Doors – Interior and exterior doors with framing

WINDOWS

  • Windows – Standard rectangular windows

EXTERIOR BLINDS

  • Exterior Blinds – Outdoor shading blinds for window protection

GABLE ROOF

  • Gable Elements – Complete roof build-up including insulation, vapor barriers, wooden framing, and gutters

WALLS STRUCTURAL FRAMINGS

  • Wall Structural Framings – Load-bearing wall frame construction

WALLS CLT PANELS

  • CLT Panels – Cross-laminated timber wall elements

CONTACT FACADE

  • Contact Facade System – Insulated facade with plaster finish and reinforcement mesh

VENTILATED FACADE

  • Ventilated Facade System – Wooden-clad ventilated facade with layered insulation and mesh

DRYWALLS

  • Interior Drywalls – Plasterboard partitions for internal walls
  • Ceiling Drywalls – Suspended ceiling system with plasterboard and metal profiles
  • Interior Paint – Final surface coating for interior walls and ceilings

STRUCTURAL TRANSOMS

  • Structural Transoms – Horizontal support elements in structure (e.g. beams or lintels)
MEP

ELECRTICAL EQUIPMENT

  • Electrical Equipment – Devices and systems for electrical distribution, lighting, and control throughout the building.

PHOTOVOLTAIC EQUIPMENT

  • Photovoltaic Equipment – Solar panels and related components for renewable energy production and integration into the electrical system.

MEP VENTILATION

  • Ventilation System – Mechanical air exchange system including ducts, vents, and units ensuring fresh air circulation and indoor air quality.

MEP SANITARY

  • Sanitary System – Complete plumbing infrastructure including pipes, fittings, and accessories for water supply and drainage, as well as bathroom fixtures like toilets, sinks, and showers.

MEP HEATING

  • Heating System – Equipment, piping, fittings, and accessories for distributing thermal energy for space heating, including boilers, pumps, and radiators

The devil is in the details

Detailed  budgeting

Every project includes a structured bill of quantities with real-time pricing and material options — enabling precise planning and full cost control.